March 15, 2009 11:43 pm

STS-119

|

Space Shuttle

Kennedy Space Center, FL, USA
Days
Hours
Minutes
Seconds
March 15, 2009 11:43 pm

Share:

Last Updated:

2026-07-12 05:26:10

STS-119 (ISS assembly flight 15A) was a space shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station.
Launch Overview
Window Open 23:43 UTC
Window Close 23:43 UTC
Lift Off Mar 15, 2009 · 23:43 UTC
Launch Facility Kennedy Space Center, FL, USA
Launch Pad Launch Complex 39A
Target Orbit Low Earth Orbit
Payload Overview
Customer United Space Alliance
Payload STS-119
Rocket Space Shuttle
Destination Low Earth Orbit
Recovery Overview
Landing Location See Mission Notes
Landing Type RTLS / Droneship
STS-119 (ISS assembly flight 15A) was a space shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station.

Height

LEO Payload

Total Launches

Status

United Space Alliance
Launch Complex 39A
Launch Overview
Window Open 23:43 UTC
Window Close 23:43 UTC
Lift Off Mar 15, 2009 · 23:43 UTC
Launch Facility Kennedy Space Center, FL, USA
Launch Pad Launch Complex 39A
Target Orbit Low Earth Orbit
Payload Overview
Customer United Space Alliance
Payload STS-119
Rocket Space Shuttle
Destination Low Earth Orbit
Recovery Overview
Landing Location See Mission Notes
Landing Type RTLS / Droneship

Related Stories