May 14, 2010 6:20 pm

STS-132

|

Space Shuttle

Kennedy Space Center, FL, USA
Days
Hours
Minutes
Seconds
May 14, 2010 6:20 pm

Share:

Last Updated:

2026-07-12 04:45:24

STS-132 was the second to last flight of Atlantis and an ISS assembly flight with the primary payload being the Russian Rassvet Mini-Research Module. The flight also carried the Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). The mission began on May 14th 2010 at 1820 UTC launching Commander Kenneth Ham, Pilot Domonic A. Antonelli, Mission Specialist 1 Garrett Reisman, Mission Specialist 2 Michael T. Good, Mission Specialist 3 Stephen G. Bowen & Mission Specialist 4 Piers Sellers to orbit. They docked with the ISS 2 days after launch. During the mission 3 spacewalks were conducted to install a spare space to ground Ku band antenna and to conduct general maintenence on the ISS. The mission concluded after 11 days & 18 hours on May 26th 2010 at 1249:18 UTC.
Launch Overview
Window Open 18:20 UTC
Window Close 18:20 UTC
Lift Off May 14, 2010 · 18:20 UTC
Launch Facility Kennedy Space Center, FL, USA
Launch Pad Launch Complex 39A
Target Orbit Low Earth Orbit
Payload Overview
Customer United Space Alliance
Payload STS-132
Rocket Space Shuttle
Destination Low Earth Orbit
Recovery Overview
Landing Location See Mission Notes
Landing Type RTLS / Droneship
STS-132 was the second to last flight of Atlantis and an ISS assembly flight with the primary payload being the Russian Rassvet Mini-Research Module. The flight also carried the Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). The mission began on May 14th 2010 at 1820 UTC launching Commander Kenneth Ham, Pilot Domonic A. Antonelli, Mission Specialist 1 Garrett Reisman, Mission Specialist 2 Michael T. Good, Mission Specialist 3 Stephen G. Bowen & Mission Specialist 4 Piers Sellers to orbit. They docked with the ISS 2 days after launch. During the mission 3 spacewalks were conducted to install a spare space to ground Ku band antenna and to conduct general maintenence on the ISS. The mission concluded after 11 days & 18 hours on May 26th 2010 at 1249:18 UTC.

Height

LEO Payload

Total Launches

Status

United Space Alliance
Launch Complex 39A
Launch Overview
Window Open 18:20 UTC
Window Close 18:20 UTC
Lift Off May 14, 2010 · 18:20 UTC
Launch Facility Kennedy Space Center, FL, USA
Launch Pad Launch Complex 39A
Target Orbit Low Earth Orbit
Payload Overview
Customer United Space Alliance
Payload STS-132
Rocket Space Shuttle
Destination Low Earth Orbit
Recovery Overview
Landing Location See Mission Notes
Landing Type RTLS / Droneship

Related Stories