September 9, 2006 3:14 pm

STS-115

|

Space Shuttle

Kennedy Space Center, FL, USA
Days
Hours
Minutes
Seconds
September 9, 2006 3:14 pm

Share:

Last Updated:

2026-07-12 06:55:46

STS-115 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. It was the first assembly mission to the ISS after the Columbia disaster, following the two successful Return to Flight missions, STS-114 and STS-121. STS-115 launched from Pad 39-B at the Kennedy Space Center on 9 September 2006 at 11:14:55 EDT (15:14:55 UTC). The mission is also referred to as ISS-12A by the ISS program. The mission delivered the second port-side truss segment (ITS P3/P4), a pair of solar arrays (2A and 4A), and batteries. A total of three spacewalks were performed, during which the crew connected the systems on the installed trusses, prepared them for deployment, and did other maintenance work on the station.
Launch Overview
Window Open 15:14 UTC
Window Close 15:14 UTC
Lift Off Sep 9, 2006 · 15:14 UTC
Launch Facility Kennedy Space Center, FL, USA
Launch Pad Launch Complex 39B
Target Orbit Low Earth Orbit
Payload Overview
Customer United Space Alliance
Payload STS-115
Rocket Space Shuttle
Destination Low Earth Orbit
Recovery Overview
Landing Location See Mission Notes
Landing Type RTLS / Droneship
STS-115 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis. It was the first assembly mission to the ISS after the Columbia disaster, following the two successful Return to Flight missions, STS-114 and STS-121. STS-115 launched from Pad 39-B at the Kennedy Space Center on 9 September 2006 at 11:14:55 EDT (15:14:55 UTC). The mission is also referred to as ISS-12A by the ISS program. The mission delivered the second port-side truss segment (ITS P3/P4), a pair of solar arrays (2A and 4A), and batteries. A total of three spacewalks were performed, during which the crew connected the systems on the installed trusses, prepared them for deployment, and did other maintenance work on the station.

Height

LEO Payload

Total Launches

Status

United Space Alliance
Launch Complex 39B
Launch Overview
Window Open 15:14 UTC
Window Close 15:14 UTC
Lift Off Sep 9, 2006 · 15:14 UTC
Launch Facility Kennedy Space Center, FL, USA
Launch Pad Launch Complex 39B
Target Orbit Low Earth Orbit
Payload Overview
Customer United Space Alliance
Payload STS-115
Rocket Space Shuttle
Destination Low Earth Orbit
Recovery Overview
Landing Location See Mission Notes
Landing Type RTLS / Droneship

Related Stories