It carried a 24 C-band and 32 Ku-band transponders. Anik F1R has a design life of 15 years. In addition, a Wide Area Augmentation System (WAAS-GEO 4) navigation package operating in C-band for uplink and L-band for downlink provides precision Global Positioning System-based guidance information to aircraft.
Launch Overview
Window Open
21:53 UTC
Window Close
21:53 UTC
Lift Off
Sep 8, 2005 · 21:53 UTC
Launch Facility
Baikonur Cosmodrome, Republic of Kazakhstan
Launch Pad
200/39 (200L)
Target Orbit
Geostationary Orbit
Payload Overview
Customer
Khrunichev State Research and Production Space Center
It carried a 24 C-band and 32 Ku-band transponders. Anik F1R has a design life of 15 years. In addition, a Wide Area Augmentation System (WAAS-GEO 4) navigation package operating in C-band for uplink and L-band for downlink provides precision Global Positioning System-based guidance information to aircraft.
Height
LEO Payload
Total Launches
Status
Khrunichev State Research and Production Space Center
200/39 (200L)
Launch Overview
Window Open
21:53 UTC
Window Close
21:53 UTC
Lift Off
Sep 8, 2005 · 21:53 UTC
Launch Facility
Baikonur Cosmodrome, Republic of Kazakhstan
Launch Pad
200/39 (200L)
Target Orbit
Geostationary Orbit
Payload Overview
Customer
Khrunichev State Research and Production Space Center